PowerStackHubSolar panels, inverters, lithium batteries, ESS cabinets, and battery management systems for global industrial buyers.
Beny Opcc1.6j 180kw 60kw Commercial DC EV Fast Charger Station CCS2 DC Electric Vehicle Charging Pil
Battery Fire Suppression

Beny Opcc1.6j 180kw 60kw Commercial DC EV Fast Ch | RFQ Sourcing Details

Battery Fire Suppression · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryBattery Fire Suppression
Unitset
CategoryBattery Fire Suppression
AvailabilityInquiry required
Updated2026-05-26

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Battery Fire Suppression. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

Why Choose Us Top Brand in Protection for Solar PV, Battery Energy Storage and EV Charging System QUALITY PV PROTECTION PRODUCTS AND EV CHARGERS MANUFACTURER We are a leading brand in annually producing hundreds of thousands of quality DC protection products and EV charging stations for complete and reliable solar photovoltaic, battery energy storage, and EV charging system.

Certified by UL, SAA, CB, CE, TUV, UKCA, ISO, and RoHS ,we have the first listed patented DC switch and produce creative solutions like the AFCI solution for rooftop fire protection, dynamic load balancing, and PEN fault detection EV charger.

Product Parameters Highlights : * 30kW/40kW/60kW/90kW/120kW/150kW/180kW/240kW Optional *52kW/82kW/112kW/142kW/172kW/202kW/262kW Optional * 1 Guns or 2 Guns or 3 Guns ( CCS1, CCS2,Chademo,GBT, AC Optional) * Floor-stand * 7inch LCD screen/LED light * OCPP 1.6 * IP55 * 24 Months Warranty * Time-saving - Fast charging * Power saving - High conversion efficiency and low standby power consumption * High Safety - Dual protection to both manual operation and vehicles FAST, EFFICIENT AND SAFE EV CHARGING STATION BENY DC EV charging station has more powerful data calculation and processing capacity, smarter dispatching strategy, better heat dissipation performance and lower noise, and fully meets the requirements of high-power DC charging of vehicles with global standard DC interface.

The product has multiple protection design and active protective function, which can monitor all communication data in the charging process and give early warning to all kinds of abnormal charging to ensure the safety of users and vehicles Models BDC60-D BDC90-D BDC120-D BDC150-D BDC180-D BDC240-D Rated Power 60kW 90kW 120kW 150kW 180kW 240kW Shell Material Sheet Meal Dimension 800*800*1800(L*W*T) Weight ≤500kG Installation Method Floor-stand Type Cable Routing Bottom Inlet Wiring,Up Outlet Wiring Cable Length 5 M Charging Outlets Double(CCS1+CCS1) Double (CCS1+CHADEMO) Double(CCS2+GBT) Double(CHADEMO+CHADEMO) Double(CCS2+CCS2) Double (CCS2+CHADEMO) Double(CHADEMO+GBT) Double(CCS1+CCS2) Double(CCS1+GBT) Double(GBT+GBT) Connectivity Authorization RFID, App Screen 7 Inch LCD Screen/LED Light Electrical Specification AC Input Voltage AC380V±15% ,3P+N+PEAC Input Frequency 50.

Hz/60. Hz Consumption ≤24W Output Voltage Range CCS1/CCS2/GBT: 150. Vdc -1000. Vdc;CHADEMO: 150. Vdc -500. Vdc Output C

Beny | Applications and Buyer Notes

Beny is organized as a sourcing-ready Battery Fire Suppression reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time que

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Battery Fire SuppressionBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryBattery Fire Suppression
Unitset

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

PowerStackHub related sourcing paths

PowerStackHub procurement phrases

PowerStackHub related product samples