EnergyStorageSupplySolar panels, inverters, lithium batteries, ESS cabinets, and battery management systems for global industrial buyers.
Jinko/Longi/Trina/Ja Solar Power Panel 530W 535W 540 Watt 545W 500W 550W Jinko Solar Panel Tiger PRO
Port And Wharf Equipment

Jinko/Longi/Trina/Ja Solar Power Panel 530W 535W 540 Watt 545W 500W 550W Jinko Solar Panel Tiger PRO

This detail page turns one product record into a narrower sourcing decision with clearer category fit, adjacent routes and RFQ-ready context.

Quote on request

Jinko | Applications and Buyer Notes

Jinko is organized as a sourcing-ready Port And Wharf Equipment reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time qu

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Vertical Site
energystoragesupplyBased on visible page data; confirm exact value in the RFQ.
Category
Solar Panels and ModulesBased on visible page data; confirm exact value in the RFQ.
Source Domain
ahguangya.en.made-in-china.comBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.
After-sales Service
YesBased on visible page data; confirm exact value in the RFQ.
Application
solar, monocrystalline, commercialBased on visible page data; confirm exact value in the RFQ.
Capacity
2000.000kgBased on visible page data; confirm exact value in the RFQ.
Certification
ISO, CE, TUVBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Product sourcing profile

CategoryPort And Wharf Equipment
Inquiry workflowPlatform RFQ workflow
AvailabilityInquiry required
Updated2026-05-04

Product introduction

Home Metallurgy, Mineral & Energy Solar & Renewable Energy Solar Panels Jinko/Longi/Trina/Ja Solar Power Panel 530W 535W 540 Watt 545W 500W 550W Jinko Solar Panel Tiger PRO US$0.16 10,000-49,999 Watt US$0.15 50,000-99,999 Watt US$0.13 100,000+ Watt Start OrderEnergyStorageSupply curates RFQ-led product discovery for buyers looking for solar panels and modules options. The page is organized around specification review, application fit, and inquiry-ready comparison.When evaluating this product, buyers should confirm application fit, required performance range, installation environment, lead time, documentation, and whether the supplier can support OEM or project quotations. Current vertical focus: solar panels, inverters, lithium batteries, ess cabinets, and battery management systems sourcing and rfq-ready export supply platform.solarmonocrystallinecommercialbatteries

Selection and RFQ points

Review material fit, application context, alternatives and RFQ detail before comparing related product paths.

Material fit Port Wharf Equipment

Confirm material, size, finish, tolerance and processing needs before price comparison.

Application fit application, operating environment and usage frequency

Add the target application and operating context so related products can be compared correctly.

Alternative path Solar Panels Modules

Use nearby materials, equipment types or category pages when this record is close but not exact.

RFQ detail Quantity, destination, timing

Include quantity, destination, target delivery window, packaging and any technical constraints.

Key specifications

Vertical Siteenergystoragesupply
CategorySolar Panels and Modules
Source Domainahguangya.en.made-in-china.com
Brand
Unitset
After-sales ServiceYes
Applicationsolar, monocrystalline, commercial
Capacity2000.000kg
CategorySolar Panels and Modules
Cell TypeP type Mono-crystalline
CertificationISO, CE, TUV
ConditionNew
CustomizationAvailable
Dimensions2274×1134×35mm (89.53×44.65×1.38 inch)
Feature Highlightsaluminum, digital
FrameAnodized Aluminium Alloy
Front Glass3.2mm,Anti-Reflection Coating, High Transmission, Low Iron, Tempered Glass
Junction BoxIP68 Rated
Matched Termssolar, monocrystalline, commercial, batteries
MaterialMonocrystalline Silicon
Model NO.JKM535M-72HLM-BDVP
No.of Half-cells144 (6×24)
Number of Cells144cells
OriginChina
Output CablesTÜV 1x4.0mm2-200mm or Customized Length
Power530w
Product TitleJinko/Longi/Trina/Ja Solar Power Panel 530W 535W 540 Watt 545W 500W 550W Jinko Solar Panel Tiger PRO
Refund policyClaim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secure paymentsEvery payment you make on Made-in-China.com is protected by the platform.
Shipping Cost.
Specification2096*1039*30mm
TrademarkJinko solar
Transport Package35PCS/Pallets, 70PCS/Stack, 770PCS/ 40'hq Containe
Warranty25 Years
Weight28 kg (61.73 lbs)

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Related keyword paths

Grouped by the product keyword that generated the related path.

SOURCING DECISION BRIEF

Jinko/Longi/Trina/Ja Solar Power Panel 530W 535W 540 Watt 545W 500W 550W Jinko Solar Panel Tiger PRO sourcing decision b...

This detail page turns one product record into a narrower sourcing decision with clearer category fit, adjacent routes and RFQ-ready context.

Category
Solar Panels and Modules
Price status
Quote on request
Inquiry model
Structured product RFQ with quantity, destination and technical requirements.
Availability
Confirm by inquiry
Sourcing lens
Product detail to shortlist decision
Primary compare
Vertical Site, Category, Source Domain
Record focus
Jinko/longi/trina/ja Solar Power Panel 530w 535w 540 Watt 545w 500w 550w Jinko Solar Panel Tiger Pro
Category focus
Port And Wharf Equipment
Buyer checklist
  • Category fit: Confirm whether the product belongs to the right category and nearby application path before outreach.
  • Specification depth: Review the visible specifications and convert missing fields into a clearer RFQ requirement set.
  • Route expansion: Use adjacent category, solution and procurement routes before settling on one detail page.
How should buyers use this detail page?

Use the detail page as a product-fit checkpoint. Confirm category placement, visible specifications and adjacent sourcing paths before sending an RFQ.

What should buyers compare first?

Compare the visible specifications, category fit and the nearest application or solution routes before asking for supplier options.

EnergyStorageSupply related sourcing paths

EnergyStorageSupply procurement phrases

EnergyStorageSupply project-fit checks

Application Confirm Application before comparing offers or moving the inquiry forward.
Country Confirm Country before comparing offers or moving the inquiry forward.
Capacity Confirm Capacity before comparing offers or moving the inquiry forward.
Material Confirm Material before comparing offers or moving the inquiry forward.
Application route Use Application to compare adjacent options instead of relying on one broad title match.
Country route Use Country to compare adjacent options instead of relying on one broad title match.

EnergyStorageSupply related product samples

Procurement notes

If visible specifications are still thin, add model, material, interface, quantity, application fit, destination and target lead time before comparing quotes.

Next sourcing actions