PowerStackHubSolar panels, inverters, lithium batteries, ESS cabinets, and battery management systems for global industrial buyers.
Solar Power Charge LED Hang Bulb Tube Light Lamp Lantern
Battery Fire Suppression

Solar Power Charge LED Hang Bulb Tube Light Lamp | RFQ Sourcing Details

Battery Fire Suppression · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryBattery Fire Suppression
Unitset
CategoryBattery Fire Suppression
AvailabilityInquiry required
Updated2026-05-26

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Battery Fire Suppression. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

Product Name: solar LED hang bulb Item No.: JT-S02B2K-2.5AD-1 Production Description: The LED light works with electricity,or inner battery, battery is charged by solar panel, DC input charger: solar panel or AC adaptor;solar panel:5V/3W;Lighting time: 1--- AC 85-265V power supply, no lighting time limited;2---Inner battery power supply, 10 hours LED lamp:2.5W,material ABS+PS, LED chips:Taiwan Brand;LED board:Aliminum heat disspation, lamp top:E14/E27/B22;Battery:Lithium rechargeable battery 4000m.

Ah;PCB:Glass fiber board,over-charge and over-discharge protection,Constant current discharge, LED indicator;roller 1 set Instruction sheet + warranty card Product: 1set/Color box, Logo can be printed Model No.

Description Unit Price JT-S01B16-4.4AD-1 (hang tube with remote control) * The LED light works with electricity,or inner battery, battery is charged by solar panel;DC input charger: solar panel or USB;* LED tube lighting time(when used inner battery): 5 lighting class,4.4W-4.0hrs,3.4W-5.2hrs,2.4W-7.5hrs,1.4W-10hrs,1W-18hrs;* solar panel:5V/3W,warranty 5 years;* LED tube:4.4W,material ABS+PS,1pcs,LED chips:Taiwan Brand;LED board:Aliminum heat disspation,tube pin:wall hang pin,warranty:24 months;* Battery:Lithium 3.7V/4000m.

Ah,warranty 24 months;* PCB:Glass fiber board,over-charge and over-discharge protection,Constant current discharge, LED indicator,warranty 5 years;* tricity,or inner battery, battery is charged by solar panel, DC input charger: solar panel or USB;* LED tube lighting time(when used inner battery): 5 lighting class,4.4W-4.0hrs,3.4W-5.2hrs,2.4W-7.5hrs,1.4W-10hrs,1W-18hrs * Remote controller: 5 lighting class control, control distance 0-8m;* solar panel:5V/3W,warranty 5 years;* LED tube:4.4W,material ABS+PS,1pcs,LED chips:Taiwan Brand;LED board:Aliminum heat disspation,tube pin:wall hang pin,warranty:24 months;* Battery:Lithium 3.7V/4000m.

Ah,warranty 24 months;* PCB:Glass fiber board,over-charge and over-discharge protection,Constant current discharge, LED indicator,warranty 5 years;*

Solar | Applications and Buyer Notes

Solar is organized as a sourcing-ready Battery Fire Suppression reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time qu

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Battery Fire SuppressionBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryBattery Fire Suppression
Unitset

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

PowerStackHub related sourcing paths

PowerStackHub procurement phrases

PowerStackHub related product samples