PowerStackHubSolar panels, inverters, lithium batteries, ESS cabinets, and battery management systems for global industrial buyers.
Sunrain Full Inverter R32 Air to Water Pool Heat Pump
Battery Cooling Systems

Sunrain Full Inverter R32 Air to Water Pool Heat | RFQ Sourcing Details

Battery Cooling Systems · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

Unitset
CertificationSASO, RoHS, CB, CCC, ISO9001, CE, Keymark Working Medium: R290 Heat Source
CategoryBattery Cooling Systems
CategoryBattery Cooling Systems
AvailabilityInquiry required
Updated2026-05-27

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Battery Cooling Systems. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

Product Features 1)R32 low GWP eco refrigerant 2)DC inverter fan motor & Ultra quiet operation 3)High-end Mitsubishi compressor & Build in Wifi 4)Heating & Cooling function- constant water temperature 5)In Green R32 Refrigenrant Cool responsibly with R32 refrigerant.

Lower GWP, higher efficiency, and improved performance.

Make the eco-friendly choice for a greener tomorrow Super Low Noise Heat Pump Machine Operates at a Whispering 39dB to 49 dB Main Components HIGH-END MITSUBISHI COMPRESSOR In contrast to AC drive technology, DC inverter speed technology often regulates compressor control process more accura moto control enables super-quiet fan operation and minimizes power consumption ELECTRONIC EXPANSION VALVE In order to maintain the stability of the refrigeration the system, and electronic valve can quickly alter the flow of regrigerant.

TITANIUM TUBE HEAT EXCHANGER Super anti-corrosion, 30% increase in heat exchange, long durability. ANTI-CORROSIVE PLASTIC COVER The housing material of the pool heater is made of anti-corrosive plastic, very suitable for the humid environment of the swimming pool, rust problem can never be seen.

Everything in One App Installation Diagram Product Parameters Model No.

BYC-007TE1 BYC-010TE1 BYC-013TE1 BYC-017TE1 BYC-021TE1 BYC-028TE1 BYC-035TE1 BYC-028TE3 BYC-035TE3 Heating Capacity at Air 26ºC,Humidity 80%,Water 26ºC,28ºC out Heating Capacity(kw) 7.6~1.7 9.5~2.3 13.2~3.0 17.3~3.8 21.1~4.8 28.2~6.8 35.3~8.8 28.2~6.8 35.3~8.8 Power Input(kw) 1.12~ ~ ~ ~ ~ ~ ~ ~ ~0.56 COP 15.8~6.8 15.8~6.8 15.8~6.8 15.8~6.8 15.8~6.8 15.8~6.8 15.8~6.8 15.8~6.8 15.8~6.8 Heating Capacity at Air 15ºC,Humidity 70%,Water 26ºC,28ºC out Heating Capacity(kw) 6.1~1.4 7.6~1.9 9.8~2.3 13.5~3.0 16.5~3.8 23.1~5.5 25.5~6.4 23.1~5.5 25.5~6.4 Power Input(KW) 1.24~ ~ ~ ~ ~0.5 4.7~0.72 5.2~0.84 4.7~0.72 5.2~0.84 COP 7.6~4.9 7.6~4.9 7.6~4.9 7.6~4.9 7.6~4.9 7.6~4.9 7.6~4.9 7.6~4.9 7.6~4.9 Cooling Capacity at Air 35ºC,Water 29ºC,27ºC out Heating Capacity(kw) 4.2~1.0 5.3~1.3 7.2~1.7 9.4~2.1 11.6

Sunrain | Applications and Buyer Notes

Sunrain is organized as a sourcing-ready Battery Cooling Systems reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time q

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Unit
setBased on visible page data; confirm exact value in the RFQ.
Certification
SASO, RoHS, CB, CCC, ISO9001, CE, Keymark Working Medium: R290 Heat SourceBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

Unitset
CertificationSASO, RoHS, CB, CCC, ISO9001, CE, Keymark Working Medium: R290 Heat Source

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

PowerStackHub related sourcing paths

PowerStackHub procurement phrases

PowerStackHub related product samples